Replacement & Maintenance of Turbines
Power PlantReplacement & Maintenance of Turbines
Power Plant
Replacement & Maintenance of Turbines
-
LP Rotor Drawer Exchanging the LP TBN of the Yeonggwang nuclear power No.1.2
-
LP Lower Casing Drawer Exchanging the LP TBN of the Yeonggwang nuclear power No.1.2
-
LP Rotor Drawer Exchanging the LP TBN of the Yeonggwang nuclear power No.1.2
-
Seating the Exist LP Rotor Exchanging the LP TBN of the Yeonggwang nuclear power No.1.2
-
Seating the Exist LP Lower Casing Exchanging the LP TBN of the Yeonggwang nuclear power No.1.2
-
Blade Ring Dismantling, Lifting Upper Compressor of the Pocheon Combined Cycle Power Generation
-
Blade Ring Assembly & Clearance Check Upper Compressor of the Pocheon Combined Cycle Power Generation
-
Blade Ring Assembly & Bolt Tightening Upper Compressor of the Pocheon Combined Cycle Power Generation
-
Blade Ring Assembly & Bolt Tightening Upper Compressor of the Pocheon Combined Cycle Power Generation
-
Leveling adjustment for Cylinder Assembly Upper Compressor of the Pocheon Combined Cycle Power Generation
-
Cylinder Seating after the Lifting Upper Compressor of the Pocheon Combined Cycle Power Generation