한국플랜테크 | Hankuk Plantech



Logistics Storage System

Delivery PerformanceLogistics Storage System

Logistics Storage System

Date Performance
2007.01 Manufactured and installed the Mobile Rack of the Masan factory
2007.09 Manufactured and installed the storage rack for heavy goods at the public service building
2008.02 Manufactured and installed the Expanded Pallet Rack at Dooseo
2008.03 Manufactured and installed the pallet rack
2009.01 Manufactured and delivered the parts storage racks
2009.06 Manufactured and designed the dustproof mechanism storage of the turbine factory
2010.03 Manufactured and installed the pallet rack
2010.09 Manufactured and installed the pallet rack
2010.12 Manufactured and installed the pallet rack
2010.12 Manufactured and installed the drive-in rack
2011.01 Manufactured and installed the pallet rack and more
2011.03 Manufactured and installed the three-way pallet rack
2011.12 Installed the rack of the welding material warehouse at the factory No.1
2012.02 Removed and installed the three-way pallet rack of the GLS center in other location
2012.05 Manufactured and installed the pallet rack
2012.05 Redeemed the storage rack of the product warehouse building A
2012.06 Installed the new rack of the Export Processing Center
2012.11 Installed the expansion rack of integrated warehouse of the packaging cooked rice
2013.03 Installed the rack of the logistics warehouse
2013.04 Installed the pallet rack
2013.07 Installed the pallet rack of the Chungju factory, etc
2013.10 Installed the pallet rack and more
2013.11 Pallet Rack
2014.02 Pallet Rack
2014.06 Repaired the rack of the new rice warehouse of the Busan factory
2014.10 Installed the pallet rack of the mill packaging warehouse
2014.11 Manufactured and installed the pallet rack
2014.11 Rack of the raw materials storage of the terminals
2015.03 Manufactured and installed the separation table of mold and more
2015.05 Installed the pallet rack
2015.07 Heavy weight rack of Raw materials storage, etc.
2015.09 Installed the pallet rack to the Woongdong normal temperature warehouse and cold storage warehouse
2015.10 Removed the crane and installed the pallet rack
2015.12 Manufactured and installed the pallet rack
2016.01 Manufactured and installed the pallet rack to the Woongdong normal temperature warehouse and cold storage warehouse
2016.03 Delivered the weight storage locker
2016.04 Installed the products storage rack of the Export Processing Center