2008.01 | Coil brazing & grinding of the Shin-Kori Rotor No.2 | Doosan Heavy Industries & Construction |
2009.04 | Following step of the Pyeongtaek No.1 Stator Bar Compounding (Armoring Etc.) | Doosan Heavy Industries & Construction |
2009.07 | Following step of the Cirebon/Gheco Stator Bar Compounding | Doosan Heavy Industries & Construction |
2009.11 | Batch assemble of the Yecheon pumping-up No.1&2 Rotor Pole Assembly | Doosan Heavy Industries & Construction |
2010.01 | Assembled and manufactured the Yecheon pumping-up No.1&2 Field Coil Assembly | Doosan Heavy Industries & Construction |
2010.02 | Brazing, grinding & modify the Cirebon/Gheco Rotor Coil | Doosan Heavy Industries & Construction |
2010.03 | Coil brazing & grinding of the Shin-Wolsong Rotor No.1&2 | Doosan Heavy Industries & Construction |
2010.04 | Following step of the Pyeongtaek Stator Bar No.2 Compounding | Doosan Heavy Industries & Construction |
2010.04 | Precisely inspected of the Sancheong pumping-up Generator No.2 Rotor/Stator | KEPCO KPS |
2010.04 | Inspected and repaired the cooling line of the Pyeongtaek Generator No.4 Stator Winding | Doosan Heavy Industries & Construction |
2010.04 | Maintenance of the Sancheong pumping-up Generator No.2 | Doosan Heavy Industries & Construction |
2010.06 | Assembled and supported to the Yeongheung Stator No.2 Winding | Doosan Heavy Industries & Construction |
2010.07 | Service for the performance evaluation and data collection of the Uljin No.1&2's existing facilities | Doosan Heavy Industries & Construction |
2011.02 | 7FH2 Semi-stacking | Doosan Heavy Industries & Construction |
2011.02 | Assembled the Yecheon pumping-up Generator No.2 Site | Doosan Heavy Industries & Construction |
2011.03 | Re-Winding of the Pyeongtaek Generator No.3&4 Stator | Doosan Heavy Industries & Construction |
2011.07 | Assembled the Shin-Kori No.4 Top Cover | Doosan Heavy Industries & Construction |
2011.08 | Technical supervision of the Uljin Generator No.2 dismantling | Doosan Heavy Industries & Construction |
2011.08 | Dismantled the Shin-Kori 3&4 T/G Stator No.4 winding | Doosan Heavy Industries & Construction |
2012.01 | Rabigh2 No.1~4 HP/IP Diaphragm Partition Ass'y | Doosan Heavy Industries & Construction |
2012.05 | Winding of the 4000MVA short circuit Generator Stator | KERI |
2012.07 | Emergency restoration service of the Yeonggwang Generator No.4 Stator Windings | Doosan Heavy Industries & Construction |
2012.08 | Defect repairing service of the Amman East (Jordan) | Doosan Heavy Industries & Construction |
2012.08 | Exchange of the Uljin Generator No.1&2 (Machinery sector) | Doosan Heavy Industries & Construction |
2012.11 | Restoration of the Yecheon pumping-up CT polarity | Doosan Heavy Industries & Construction |
2012.11 | Yanbu2/Pocheon/Yangju/Sejong combined heat and power Semi-Stacking | Doosan Heavy Industries & Construction |
2012.12 | Following step of the Pocheon No.1&2/Yanbu No.1~3 Stator Bar Compounding | Doosan Heavy Industries & Construction |
2013.01 | Assembled the Yangju LP Casing | Pan Korea |
2013.04 | Repaired the Yecheon pumping-up Generator Rotor No.2 & Stator | Doosan Heavy Industries & Construction |
2013.05 | Exchanged the Hadong CT No.8 | Doosan Heavy Industries & Construction |
2013.09 | Exchanged Uljin Generator No.2 Foot, installed workbench and defect repairing | Doosan Heavy Industries & Construction |
2013.10 | Improved the performance of the Yeonggwang No.1&2 low-pressure turbine | Doosan Heavy Industries & Construction |
2013.10 | Reinforced the crack of the Sancheong pumping-up Rotor pole to pole | KEPCO KPS |
2013.11 | Defect repair after installing the rear stage valve of the Hanul Generator No.1 GHE 005/006PO | Doosan Heavy Industries & Construction |
2014.03 | Reinforced the retaining wall of the generator building for transport the Short circuit Generator Rotor | Doosan Heavy Industries & Construction |
2014.03 | Change the piping type of the Hadong No.7&8 | Doosan Heavy Industries & Construction |
2014.03 | Re-winding work of the Short circuit Generator | KERI |
2014.04 | Re-Winding of the KERI short circuit Generator Stator and reinforced the transporting section | Doosan Heavy Industries & Construction |
2014.05 | Repairing the hydrogen leak of the Sejong combined cycle power Generator | Doosan Heavy Industries & Construction |
2014.07 | Measured the dimension of cooling water field pipes of the Wolsong No.1 stator / design / pipe stress analysis / material supply / installation | Doosan Heavy Industries & Construction |
2014.12 | Modified the seal oil supply line pipes for the end shield side of the Hanul No.2 | Doosan Heavy Industries & Construction |
2015.01 | Exchanged the Bundang combined cycle power Generator No.1,2,4,5 Stator re-winding and installed the workplace | Doosan Heavy Industries & Construction |
2015.01 | Preparation for high-power test of the high-power evaluation room #1 and maintenance of high-power test facilities | KERI |
2015.04 | Repaired the testing Generator of the LSIS Corp. | LG IS Co. Ltd. |
2015.04 | Save processing the preliminary stator of the Bundang GT Generator | KEPS |
2015.04 | XKERI-2/Base & frame modification for lube Oil tank | MHPS (Mitsubishi Hitachi Power Systems) |
2015.05 | XKERI-2&3 Induction Motor Base Modification | MHPS (Mitsubishi Hitachi Power Systems) |
2015.09 | Dismantling and assembly of Induction Motor No.1 | KERI |
2015.10 | Exchanged the Compress Diaphragm of the Pocheon combined cycle power GT No.4 | Doosan Heavy Industries & Construction |
2015.10 | KERI 4000MVA Site Lube Oil Suction Line Y-Stainer Install and Etc. | MHPS (Mitsubishi Hitachi Power Systems) |
2015.11 | Re-Winding the Hanbit Generator No.3&4 Stator | Doosan Heavy Industries & Construction |
2016.01 | Preparation for high-power test of the high-power evaluation room #1 and maintenance of high-power test facilities | KERI |
2016.03 | Checked the Hanul Generator No.3 Stator winding | Doosan Heavy Industries & Construction |
2016.03 | Constructed the main facilities of the 4000MVA high power testing equip | Hanjin Heavy Industry & Construction |
2016.03 | KERI-2&3 4000MVA site works for oil leak from oil deflector of turning gear casing | MHPS (Mitsubishi Hitachi Power Systems) |
2016.06 | Repaired the Shin-Kori No.3 low-pressure turbine rotor | Doosan Heavy Industries & Construction |
2016.06 | Site work / installation of the oil cooler | MHPS (Mitsubishi Hitachi Power Systems) |