한국플랜테크 | Hankuk Plantech



Power Plant

Delivery PerformancePower Plant

Power Plant

Date Performance
2008.01 Coil brazing & grinding of the Shin-Kori Rotor No.2
2009.04 Following step of the Pyeongtaek No.1 Stator Bar Compounding (Armoring Etc.)
2009.07 Following step of the Cirebon/Gheco Stator Bar Compounding
2009.11 Batch assemble of the Yecheon pumping-up No.1&2 Rotor Pole Assembly
2010.01 Assembled and manufactured the Yecheon pumping-up No.1&2 Field Coil Assembly
2010.02 Brazing, grinding & modify the Cirebon/Gheco Rotor Coil
2010.03 Coil brazing & grinding of the Shin-Wolsong Rotor No.1&2
2010.04 Following step of the Pyeongtaek Stator Bar No.2 Compounding
2010.04 Precisely inspected of the Sancheong pumping-up Generator No.2 Rotor/Stator
2010.04 Inspected and repaired the cooling line of the Pyeongtaek Generator No.4 Stator Winding
2010.04 Maintenance of the Sancheong pumping-up Generator No.2
2010.06 Assembled and supported to the Yeongheung Stator No.2 Winding
2010.07 Service for the performance evaluation and data collection of the Uljin No.1&2's existing facilities
2011.02 7FH2 Semi-stacking
2011.02 Assembled the Yecheon pumping-up Generator No.2 Site
2011.03 Re-Winding of the Pyeongtaek Generator No.3&4 Stator
2011.07 Assembled the Shin-Kori No.4 Top Cover
2011.08 Technical supervision of the Uljin Generator No.2 dismantling
2011.08 Dismantled the Shin-Kori 3&4 T/G Stator No.4 winding
2012.01 Rabigh2 No.1~4 HP/IP Diaphragm Partition Ass'y
2012.05 Winding of the 4000MVA short circuit Generator Stator
2012.07 Emergency restoration service of the Yeonggwang Generator No.4 Stator Windings
2012.08 Defect repairing service of the Amman East (Jordan)
2012.08 Exchange of the Uljin Generator No.1&2 (Machinery sector)
2012.11 Restoration of the Yecheon pumping-up CT polarity
2012.11 Yanbu2/Pocheon/Yangju/Sejong combined heat and power Semi-Stacking
2012.12 Following step of the Pocheon No.1&2/Yanbu No.1~3 Stator Bar Compounding
2013.01 Assembled the Yangju LP Casing
2013.04 Repaired the Yecheon pumping-up Generator Rotor No.2 & Stator
2013.05 Exchanged the Hadong CT No.8
2013.09 Exchanged Uljin Generator No.2 Foot, installed workbench and defect repairing
2013.10 Improved the performance of the Yeonggwang No.1&2 low-pressure turbine
2013.10 Reinforced the crack of the Sancheong pumping-up Rotor pole to pole
2013.11 Defect repair after installing the rear stage valve of the Hanul Generator No.1 GHE 005/006PO
2014.03 Reinforced the retaining wall of the generator building for transport the Short circuit Generator Rotor
2014.03 Change the piping type of the Hadong No.7&8
2014.03 Re-winding work of the Short circuit Generator
2014.04 Re-Winding of the KERI short circuit Generator Stator and reinforced the transporting section
2014.05 Repairing the hydrogen leak of the Sejong combined cycle power Generator
2014.07 Measured the dimension of cooling water field pipes of the Wolsong No.1 stator / design / pipe stress analysis / material supply / installation
2014.12 Modified the seal oil supply line pipes for the end shield side of the Hanul No.2
2015.01 Exchanged the Bundang combined cycle power Generator No.1,2,4,5 Stator re-winding and installed the workplace
2015.01 Preparation for high-power test of the high-power evaluation room #1 and maintenance of high-power test facilities
2015.04 Repaired the testing Generator of the LSIS Corp.
2015.04 Save processing the preliminary stator of the Bundang GT Generator
2015.04 XKERI-2/Base & frame modification for lube Oil tank
2015.05 XKERI-2&3 Induction Motor Base Modification
2015.09 Dismantling and assembly of Induction Motor No.1
2015.10 Exchanged the Compress Diaphragm of the Pocheon combined cycle power GT No.4
2015.10 KERI 4000MVA Site Lube Oil Suction Line Y-Stainer Install and Etc.
2015.11 Re-Winding the Hanbit Generator No.3&4 Stator
2016.01 Preparation for high-power test of the high-power evaluation room #1 and maintenance of high-power test facilities
2016.03 Checked the Hanul Generator No.3 Stator winding
2016.03 Constructed the main facilities of the 4000MVA high power testing equip
2016.03 KERI-2&3 4000MVA site works for oil leak from oil deflector of turning gear casing
2016.06 Repaired the Shin-Kori No.3 low-pressure turbine rotor
2016.06 Site work / installation of the oil cooler